Proposed Project List
McComb Elementary
Serving Pre-K through second grade
Enhance Safety & Security
- Replace the PA system (add a new master console, provide two-way communication between classrooms and the main office, add speakers, and integrate with the clock system)
- Upgrade the security camera system
- Replace clock system (provide digital display clocks, front-end controller, and wireless time connection)
- Replace the building fire alarm system to meet current code requirements
- Replace corridor fire door hardware
- Replace interior door frames and hardware
- Replace main and south parking lot pavement
- Replace perimeter and playground fencing
- Remove asbestos
Enhance Educational Spaces
- Update classroom instructional technology
- Replace playground equipment
- Add additional classrooms
- Purchase furniture for new classrooms
- Replace classroom window shades
- Replace classroom casework
- Replace the kitchen cooler condenser
- Add a new office/conference room
- Renovate restrooms (finishes and exhaust fans)
Improve Operational Efficiencies
- Replace all classroom windows
- Replace PVC roof
- Add pipe insulation at exterior walls of west classrooms
- Replace classroom unit ventilators
- Replace gym unit ventilators
- Replace pneumatic control system
- Replace the basement sump pump